Project Applications

Bahia Honda Bridge

Main features used in this application Rail-structure interaction analysis Stability analysis

Description on this project

The truss span inspection of the bridge before doing the restoration of itself, was done by FIT
Engineering on June 2016. For the piers and abutment part, UESI performed the professional
inspection on November 2016. The bridge was mainly reviewed of the reduced section
properties and unsafety for pedestrian loads.

 

  • Fig. midas Civil Analysis Model of Bahia Honda Bridge

  • Fig. Bahia Honda Bridge

Project Contact GPI
  • Address

    RED BANK OFFICE 54 Shrewsbury Avenue, Suite A Red Bank, NJ 07701, USA

  • Introduction

    GPI has been consistently ranked in Engineering News Record’s Top Design Firms. With a staff of over 1,200 professionals including engineers, planners, scientists,technicians, drafts persons, and inspectors, GPI provides expert services in a wide range of disciplines.

  • Website

    https://www.gpinet.com

  • Email

Client

Florida Department of Environmental Protection

Engineering Consultant

GPI

Construction Period

Reconstructed in 1976

Type of Project

Truss Girder Bridge

Size of Structure

57m Main Span, 1.5km Total Length