Project Applications

Bedew Bridge

Main features used in this application Time dependent material properties for creep and shrinkage Tendon profile generator Russian moving load analysis Reinforced concrete design as per SNIP

Description on this project

To modernize the 59.14km highway, design and construction of 18 bridges, 39 pedestrian underpasses, 15 pedestrian overpasses including landscape.

 

  • Fig. midas Civil Analysis Result Diagram of Bedew Bridge

  • Fig. Bedew Bridge

  • Fig. Bedew Bridge

  • Fig. Bedew Bridge

Project Contact Lava Engineering
  • Address

    1314 cad. 1309. sok. 2/8 Aşağı Öveçler Çankaya Ankara, Turkey

  • Introduction

    Lava engineering was founded in 2008 in Ankara. They provide services intransportation Projects, engineering structures (All kinds of precast, CIP, steel orsteel composite bridges and viaducts on highways and railways), tunnels, Smallstructures (All kinds of retaining structures, underpasses, drainage systems etc.)and so on.

  • Website

    www.lava.com.tr

  • Email

    info@lava.com.tr

Location

Ashgabat, Turkmenistan

Owner

Governorship of Ashgabat

Engineering Consultant

Lava Engineering

Construction Period

2014- 2015

Type of Project

PSC Box Girder Bridge

Size of Structure

60m Main Span, 2.35km Total Length