The latest Installs, patches and release notes
Customer HubSearch our knowledge base, or open technical queries
Explore engineering trends, case studies, tricks, and tips
EventsTechnical seminars and webinars by bridge experts
Bridge Insight : New Development in Long Span Arch Bridges
The bridge is two-span, continious, CIP post-tensionned, voided slab bridge. The span length 33m,
total super-structure thickness is 1.2m.
Fig. midas Civil Analysis Result Diagram of Buttim Bridge
Fig. Buttim Bridge
Fig. Buttim Bridge
Fig. Buttim Bridge
Fig. Buttim Bridge
Fig. Buttim Bridge
1314 cad. 1309. sok. 2/8 Aşağı Öveçler Çankaya Ankara, Turkey
Lava engineering was founded in 2008 in Ankara. They provide services intransportation Projects, engineering structures (All kinds of precast, CIP, steel orsteel composite bridges and viaducts on highways and railways), tunnels, Smallstructures (All kinds of retaining structures, underpasses, drainage systems etc.)and so on.
No waiting. No nasties. No credit card required.
Start Free Trial Talk to consultants