Byker Viaduct

Main features used in this application Construction stages analysis with post tensioning considering creep and shrinkage Moving load analysis

Description on this project

The assessment of the Byker Viaduct is completed using a three-dimensional line model in. The viaduct is drawn up in AutoCAD and imported to midas Civil due to the complex geometry which saves a lot of time in  creating the model. The bearings are modeled as elastic links which provide simple results extraction to check the bearing schedule. The load inputs for permanent and live loads are straightforward due to the intuitive menu. The way the program output results provide simple extraction of required data.

 

  • Fig. midas Civil Analysis Result Diagram of Byker Viaduct

  • Fig. Byker Viaduct

  • Fig. Byker Viaduct

  • Fig. Byker Viaduct

  • Fig. Byker Viaduct

Project Contact WSP | Parsons Brinckerhoff
  • Address

    Kings Orchard 1 Queen Street Bristol Avon BS2 0HQ, UK

  • Introduction

    Parsons Brinckerhoff is one of the world's leading engineering professionalconsulting firms. Their expertise ranges from environmental remediation to urbanplanning, from engineering iconic buildings to designing sustainable transportnetworks, and from developing the energy sources of the future.

  • Website

    www.wsp-pb.com

  • Email

Location

London, UK

General Contractor

John Mowlem & Co., Ltd.

Engineering Consultant

WSP | Parsons Brinckerhoff

Construction Period

1976 - 1979

Type of Project

Balanced Cantilever PSC Box Girder Bridge

Size of Structure

815m Total Length