The latest Installs, patches and release notes
Customer HubSearch our knowledge base, or open technical queries
Explore engineering trends, case studies, tricks, and tips
EventsTechnical seminars and webinars by bridge experts
Bridge Insight : New Development in Long Span Arch Bridges
This work includes reconstruction of an I-95 Bridge and construction of the new ramp S-1
bridge over Fulton Terrace. Welded steel plate girders are utilized to optimize girder spacing
to coincide with the travel lanes. A three-stage construction of the I-95 Bridge is provided to
maintain traffic in I-95 during the construction.
Fig. midas Civil Analysis Results for the I-95 Bridge
Fig. Concrete Deck Pumping under Live load along a Diagonal Expansion Joint
Fig. Diagonal Expansion Joint (left); Truck and Lane Loading Location at the Maximum Live Load Bending Moment Result (right)
115 Glastonbury Blvd., Glastonbury, Connecticut 06033, USA
GM2 Associates was founded in 1988 and GM2’s engineers are licensed to practice all across most of the east of USA. They maintain significant in-house capabilities, ranging from complex seismic analysis to survey, construction inspection, bridge, hydraulics and drainage, bridge safety inspection, roadway, traffic, buildings and site engineering.
No waiting. No nasties. No credit card required.
Start Free Trial Talk to consultants