Project Applications

Nga Tu So Flyover Bridge

Main features used in this application Construction stage analysis with time-dependent effects Response spectrum & eigenvalue analysis Vehicle load optimization

Description on this project

Nga Tu So Flyover is the first extradosed cable-stayed flyover designed and executed in Vietnam. It has a width of 17.5m designed for 4 lanes. Pre-stressed reinforcement concrete girders cast in place and include 9 spans. The abutments and piers of the flyover are constructed on a bored pile foundation including 76 piles.

 

  • Fig. midas Civil Analysis Result Diagram of Nga Tu So FlyoverBridge

  • Fig. Nga Tu So FlyoverBridge

Project Contact Vinaconex E&C
  • Address

    No.34 Lang Ha Street, Dong Da Dist, Hanoi City, Vietnam

  • Introduction

    Vinaconex E&C is a general construction company and offers a broad rangeof services in project management, procurement, construction and technologytransfer to assist clients in all phases of development – from pre-constructionto occupancy. They are now serving both public and private sector clients inconstruction investment projects of all sizes.

  • Website

    vinaconexec.com

  • Email

    vinaconexec@vinaconexec.com.vn

Location

Hanoi, Vietnam

Owner

Major Projects Management Unit for UrbanDevelopment of Hanoi (MPMU)

Engineering Consultant

VINACONEX E&C

Construction Period

2002 - 2006

Type of Project

Extradosed Bridge

Size of Structure

237m Total Length