Project Applications

North Road Corridor Flyover Interchange

Main features used in this application Construction stage analysis with post-tensioning Settlement analysis Moving load analysis

Description on this project

The project comprises 21 interchanges intending to maximize access to the frontage roads.
The directional ramp bridge is a part of the modification to existing N5 interchange. The
directional ramp bridge will provide a direct connection between Ras Laffan and Doha to
ease the traffic predicted by the traffic model.

 

  • Fig. midas Civil Analysis Model of North Road Corridor Flyover Interchange

  • Fig. midas Civil Analysis Model of the North Road Corridor Flyover Interchange

Project Contact AECOM
  • Address

    Alfonso XII, 62, 5th floor, Madrid, 28014, Spain

  • Introduction

    AECOM provides professional technical and management support services to both public and private sector clients. They provide services in architecture, design, construction, environmental services and planning and consulting.

  • Website

    www.aecom.com

  • Email

Location

Doha, Qatar

Owner

Ashghal

General Contractor

Tekfen

Engineering Consultant

AECOM

Type of Project

PSC Box Girder Bridge

Size of Structure

74m Main Span, 343m Total Length