Project Applications

Povazska BystricaBridge

Main features used in this application Unknown load factor and lack of fit force for cable optimization Construction stage analysis Moving load analysis

Description on this project

The bridge, total length of 872m and span length of 68 + 6 x 122 + 68m, is formed by one cell box girders with large overhangs supported by the precast structure. The bridge is being casted in symmetrical cantilevers starting at piers.

 

  • Fig. midas Civil Analysis Result Diagram of Povazska Bystrica Bridge

  • Fig. Povazska Bystrica Bridge

  • Fig. Povazska Bystrica Bridge

Project Contact Strasky, Husty and Partners
  • Address

    Sumavska 524/31, 602 00 Brno, Czech Republic

  • Introduction

    It assists clients in the design and construction of a wide range of bridge andmotorway structures, from pedestrian bridges to multi-lane long-span structures,and unique or special designs for landmark structures. Their experience includescable-suspension and cable-stayed bridges, precast and cast-in-place segmentalconcrete and arch bridges.

  • Website

    www.shp.eu

  • Email

    shp@shp.eu

Engineering Consultant

Strasky, Husty and Partners

Construction Period

Completed in 2010

Type of Project

Extradosed Bridge

Size of Structure

122m Main Span, 872m Total Length

Location

Povazska Bystrica, Slovakia