Skrecon Bridge

Main features used in this application Unknown load factor and lack of fit force for cable optimization Construction stage analysis Moving load analysis Detail analysis with finite elements

Description on this project

The bridge with a total length of 140.3m has three spans with length of 30 + 70 + 30m. The deck, which is formed by a two-edge girder mutually connected by floor beams and a composite deck slabs, is suspended from two pylons.

 

  • Fig. midas Civil Analysis Model of Skrecon Bridge

  • Fig. midas Civil Analysis Result Diagram of Skrecon Bridge

Project Contact Strasky, Husty and Partners
  • Address

    Sumavska 524/31, 602 00 Brno, Czech Republic

  • Introduction

    It assists clients in the design and construction of a wide range of bridge and motorway structures, from pedestrian bridges to multi-lane long-span structures, and unique or special designs for landmark structures. Their experience includes cable-suspension and cable-stayed bridges, precast and cast-in-place segmental concrete and arch bridges.

  • Website

    www.shp.eu

  • Email

    shp@shp.eu

Location

Bohumin, Czech Republic

Engineering Consultant

Bohumin, Czech Republic

Construction Period

2009 - 2011

Type of Project

Cable-stayed Bridge

Size of Structure

70m Main Span, 140m Total Length