Project Applications

The Basarab Overpass

Main features used in this application Linear static and nonlinear dynamic analysis Time history analysis using lead rubber bearings isolators(LRB) and viscous dampers

Description on this project

The flyover connects the railway central station with the Grozavesti Bulevardul, beyond the Dambovita River in Bucharest downtown. The project is 1,478m long (including the begin/end ramps) and consists of an arch bridge over the Dambovita River (span 125m), a complex road/ tramway viaduct 791m long, a cable-stayed bridge 302m long and 40m wide over the railway tracks. The new link is completed by three side ramps connecting the flyover with secondary roads.

 

  • Fig. midas Civil Analysis Result Diagram of The Basarab Overpass

  • Fig. The Basarab Overpass

  • Fig. The Basarab Overpass

  • Fig. The Basarab Overpass

Project Contact C&T Engineering
  • Address

    via veneto 13, 31057 Lanzago di Silea TV, Italy

  • Introduction

    It is a service company operating in the field of civil engineering founded inAugust 1994 by the founding partners, ing. Francesco Toninato and ing. RuggeroCervellini.

  • Website

    www.cetengineering.it

  • Email

    info@cetengineering.it

Location

Bucharest, Romania

General Contractor

The Basarab Overpass

Engineering Consultant

C&T Engineering

Construction Period

2007 – 2010

Type of Project

PSC Box Girder Bridge

Size of Structure

125m Main Span, 1.5km Total Length