Bridge Analysis midas Civil Time History Analysis Load Rating Fatigue Analysis Case Study Bridge Engineering
Explore what midas Civil can do for your projects, and what features can help for you
The latest Installs, patches and release notes
Customer HubSearch our knowledge base, or open technical queries
Explore engineering trends, case studies, tricks, and tips
EventsTechnical seminars and webinars by bridge experts
Bridge Insight : New Development in Long Span Arch Bridges
The Latest Engineering Trends and Issues
Bridge Analysis midas Civil Time History Analysis Load Rating Fatigue Analysis Case Study Bridge Engineering
midas Civil Integral Bridges Case Study Construction Stage Analysis Composite Bridge Design Composite Steel Global Structural Analysis Grillage Deck Composite Action
midas Civil Eurocode Case Study Double Tub Girder Sinaia Road Passage Double I-Girder Single Tub Girder ITR Engineering Romanian Code Composite Bridge Design
midas Civil Bridge Assessment Steel Structure Case Study Europe Jacobs Structural Analysis Bridge Modeling Connel Bridge Scotland Cantilever Bridge Riveted Steel Structure British Standards
Case Study I girder Steel Bridges Bridge Collapse Buckling Flyover Lateral-Torsional Buckling Buckling Assessment Bridge Failure
In 2016, Kolkata witnessed a major steel bridge failure of the Vivekananda Road Flyover during construction which led to 27 deaths and 50 injured. The construction work of a 2.2km flyover began in 2009 and was expected to be completed in 2010. Although six years behind schedule, it was not yet completed the erection part till 2016 (Figure 1).
In September 2020, we hosted a webinar, “How I Design Bridges : Seismic Design of Concrete Bridges" by Kyle Turner, P.E. from Michael Baker International.
The Centennial Bridge in the city of Oradea, Romania was commissioned by Oradea City Hall to a joint venture formed of FreyRom SA & Procons SA and was designed by Integrated Road Solutions SRL in 2017-2018. The bridge was built during 2018 and was opened to traffic on 1st of December 2018, to mark the 100 years since the country was united. The bridge is an arch having a span of approximately 80m and supports a two lanes carriageway and also 2 footways with a width of 3m each.
This webinar shows a bridge design carried out in 2017 for new Composite integral bridge.The B9090 White Bridge Replacement project was commissioned by The Highland Council, Designed by AECOM and constructed by RJ McLeod. The replacement bridge was commission to bypass a Category A Listed stone bridge, which was built in the early 1750. The new bridge is a 40m span integral steel/concrete composite structure designed to support the realigned B9090 over the River Nairn.
In February 2019, we hosted a webinar, "Case Study of Steel Composite Bridge Design" by Marco Bonomo, Senior Bridge Engineer, Atkins, UK
In March 2020, we hosted a webinar, “Case Study : Construction Stage Analysis of Precast Bridge" by Saathwik Vudayagiri, Structural Engineer, BECA.
midas Civil Slab bridge Curved bridge Case Study Reinforced Concrete Wood-Armer Moments Design Optimization Reinforced Concrete Design Solid Slab Decks Support Moment Rounding
midas Civil Bridge Design Integral Bridges Soil Structure Interaction Case Study Pere Alfaras Arcadis Continuum Media P-Y Curve Spring Analogy Retaining Structures
midas Civil Eurocode Bearing Replacement Case Study Bridge Bearings PSC Bridges Bearing Design Bearing Schedule Bearings Structural Components of Bridges
Introduction
Time History Analysis Dynamic Analysis Case Study Pere Alfaras High-speed Railway Bridges PSC Box Girder Bridge Peak Acceleration Resonance Magnification Dynamic Magnification Resonant Speed Arcadis Dynamic Response
About the project
High Speed 2 is a new high-speed railway linking up London, the Midlands, the North and Scotland serving over 25 stations, including eight of Britain’s 10 largest cities and connecting around 30 million people.
AS5100 In-Service Stage Analysis midas Civil Launch Geometry Construction Stage Case Study Precast Concrete Bridges Incremental Launching Method Temporary Works Launching Stage Analysis Launched Box Girder Bridge
This case study covers the following aspects:
midas Civil Integral Bridges Case Study Structural Analysis Forder Valley Viaduct Bridge Prestressed Girder Bridge Time Dependent Material Properties Construction Stages Global Static Analysis Earth Pressure Application
This case study covers the following aspects:
midas Civil Case Study Railway Bridge Moving Load Pedestrian Bridges Moving Load Analysis Moving Load Optimization Traffic Loads Influence Line Analysis Planar Models Australian Codes Line Beam Models Grillage Models
midas Civil Bridge Design Eurocode Footbridge Warren Truss Case Study Steel Bridges Accidental Loads Dynamic Loading Barry Transportation Martin Bosak
This case study covers the following aspects:
midas Civil Bridge Design Case Study Steel Composite Bridges Highway Bridge Structural Analysis Bridge Modeling Moving Load Analysis Traffic Loads Construction Stage Analysis Structural Design Time Dependent Material Properties Panmure Busway Response Spectrum New Zealand Temperature Loadings Bearing Check AECOM
midas Civil Case Study Europe Arch Bridges Structural Analysis Bridge Modeling Construction Stage Analysis United Kindom Cable Elements Moving Loads Network Arch Bridge River Irwell Network AECOM