Bridge Analysis
midas Civil
Dynamic Analysis
Transverse Analysis
PSC Box Girder
Case Study
Cable Stayed Bridges
Boundary Conditions
Structural Analysis
Bridge Modeling
Load Cases
Saemangeum Bridge
Prestressed Concrete Girders
In this webinar, we will introduce the midas Civil application of the transverse analysis of prestressed concrete box girder in the cable-stayed bridge.
This case study highlights
1. Modeling Concept
2. Considered Load Case with Functions in midas Civil
3. Considered Boundary Conditions with Functions in midas Civil
4. Post-processing and Other Modeling Applications
The example structure below is the Saemangeum bridge in South Korea. This project is a preliminary design. The structure is a cable-stayed bridge with concrete superstructures, pylons, and piers. The superstructure is composed of pre-stressed concrete girders. The transverse analysis was carried out in midas Civil.